Generator Specifications

Test Schedule Requirements

25% Step (Warm-up): 25.0 kW (37.6 A)
50% Step: 50.0 kW (75.2 A)
75% Step (NFPA Min): 75.0 kW (112.8 A)
100% Step (Full Load): 100.0 kW (150.4 A)
110% Overload (Optional): 110.0 kW (165.4 A)

Why Load Bank Testing is Critical

Load bank testing simulates real-world electrical demands to verify engine cooling, fuel pressure, exhaust temperature, and governor response. It eliminates wet stacking (unburnt diesel build-up) by reaching optimal combustion temperature.