Load Bank Testing Calculator

Determine the kW settings required for load bank testing your generator at typical test intervals.

Convert Horsepower (HP) to Watts (W) easily. Useful for sizing generators and understanding power requirements.

Advertisement

Power Input

Test Schedule Requirements

25% Load Step --
50% Load Step --
75% Load Step --
100% Load Step --
110% Overload (Optional) --

Understanding Load Bank Testing

Load bank testing is a preventative maintenance practice used to ensure a backup generator can perform under varying electrical loads.

Generators, especially diesel engines, should not be run consistently at light loads. Running at less than 30% load can lead to "wet stacking", where unburned fuel accumulates in the exhaust system.

  • 25% to 50% Load: Warm up and initial performance validation.
  • 75% Load: Standard operational load testing.
  • 100% Load: Validating the generator can meet its fully rated capacity without overheating.